• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

CCL GB – landmark in London

The CCL GB team attended the topping out ceremony for Strata SE1, which is 147 metres in height and is the highest tower in South East London. Completion of the project was ahead of schedule and was the first project to utilise the ETAG approved X range of anchors. The design objective for the tower […]

Read More »

CCL Stressing – re-development

CCL Stressing has completed its Million Pound manufacturing development program at the Leeds site in the UK. The program has increased capacity by 50% and introduced automated quality control and assembly of parts. In early 2010 CCL will complete the purchase of the site to confirm their commitment to UK operations. CCL is currently producing […]

Read More »

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield