• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

CCL awarded post-tensioning contract for MUNA in Peru

Work has begun on a new National Archaeological Museum (MUNA) in Peru. CCL has been awarded the contract to design the post-tensioning and has already started to supply its XF bonded and XU unbonded systems on the project.

The museum will contain seven floors, three of which will be underground, and will accommodate 500,000 pre-Inca and Inca archaeological pieces. Each floor will be connected by ramps around a central atrium, allowing the natural light to accentuate the valuable collections within their surroundings. The exterior of the building will have a design reminiscent of pre-Hispanic architecture.

MUNA will be the largest museum in Peru, covering an area of ​​over 75,000 m2, and one of the most important in Latin America. The building will be located in the archaeological zone of Pachacámac, situated in Lima Province’s Lurín district on Peru’s central coast.

Construction is expected to be completed in two years.

Comments

Comments are currently disabled for this post.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield