• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Dolmsundbrua

CCL has completed its section of works on the Dolmsundbrua project on the west coast of Norway.

Connecting the remote island of Dolmøya to the larger Hitra island – which itself accesses the mainland via bridge – this cantilever structure crosses the Dolmsundet marine channel at a height of 32 metres above water level.

Brought in by the project’s main contractor, NCC Construction Norway AB, CCL supplied the post-tensioning materials and carried out the installation of CCL XM-50 and XM-60 tendons of lengths of 12-192 metres. In total, CCL installed 305 tonnes of 15.7mm strand during works.

Featuring two 50mph motor lanes, and a further pedestrian pathway, the 12-metre-wide structure significantly reduces travel time between Dolmøya and Hitra by removing the necessity of a ferry crossing.

Comments

Leave a Reply

Your email address will not be published.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield