• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Data Sheets
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

CCL completes work on Washington apartment block and car parking

BLVD Apartment Bldg.Specialist engineering solutions provider CCL has completed work on a 450-unit apartment block with an underground car park and bus garage near Washington.

The BLVD apartment block along with the bus garage and car park, which has space for 3,500 vehicles, forms part of the redevelopment of Reston Station, which is on the line connecting central Washington and Dulles Airport, in Virginia.

The mixed use project consists of five buildings housing offices, retail facilities, residential units, a hotel and a health club.

The 21-storey BLVD building is part of the 1.3 million square feet Reston Station Plaza, which is located directly above Reston Station Metro Garage Facility and adjacent to the DC Silver Line station.

CCL was awarded the post-tensioning material contract for the garage at an early stage of the design process, and the company provided almost 454 tonnes of post-tensioning materials for the project.

Marc Khoury, general manager of CCL USA Inc, said: “Being the largest underground garage on the east coast of America, the project was full of challenges.

“CCL worked closely with the client, Miller & Long, as well as the architectural and engineering team to ensure the design was completed while making certain that the constructability and schedule were also maintained.

“The success of the approach on this phase secured both Miller & Long and CCL the contract for the second phase of the project.”

The $95 million BLVD apartment has 450 luxury residential units consisting of eight-level of car parking, and 13 levels of residential slabs above.

The garage features more than 3,500 parking spaces along with a full service bus depot, and has more steel than the Eiffel Tower and more concrete than the 108-storey Willis Tower, in Chicago.

The $90m Reston Station Metro garage facility construction project is one of the biggest ongoing schemes east of the Mississippi River, and has involved excavating in excess of 500,000 cubic yards of dirt.

Comments

Leave a Reply

Your email address will not be published.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield