• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Tesco Liverpool One, Liverpool, UK

A brand-new shopping, residential and leisure area covering 42 acres at the heart of the city, Liverpool ONE is a £1 bn development of 30 buildings divided into six districts, each with its own distinctive character.

The 175 retail units, which provide 1.4 million sq ft of space, house three department stores. Leisure areas include a cinema, two hotels, restaurants, cafés and bars. Also contained within the development are apartments, offices, a park, a new public transport interchange, and underground and multi-storey car parking spaces.

Tesco’s recently completed new building on Hanover Street required the creation of voids in the post-tensioned concrete slabs. These were necessary to accommodate two hoists and a travelator.

CCL was engaged to non-destructively locate the post- tensioning tendons around the cut lines of the voids and to subsequently create small penetrations in the concrete slab. The post-tensioning duct could then be removed and the grout introduced. Prior to implementation, CCL instructed the material supplier to carry out controlled tests in its laboratory, after which a grout anchor was then mocked up to ensure complete satisfaction with the proposed solution.

CCL was appointed by the main contractor Kier as the specialist concrete repair subcontractor because of its proven ability to coordinate and execute a bespoke solution to this problem.

 

  • Download Case Study
  • Go Back
  • Tesco Liverpool One

    CONTACT US

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    Get In Touch


    Website design and build by Grey Matter | web design sheffield