External PT controls deflection in Jeddah offices
During construction of an office building in Jeddah, excessive deflection was identified in six reinforced concrete slabs. CCL was called in to address the problem because of its technical expertise. CCL carried out the strengthening works to the slabs, designing a solution which used external post-tensioning in order to prevent further deflection under the future […]
READ MORE