M&T BANK STADIUM, BALTIMORE, USA

NFL Baltimore Ravens are undergoing a $430-million renovation of their home stadium, M&T Bank Stadium, located in Baltimore, USA.

CCL was brought in to provide strengthening services to accommodate the additional structure weight of adding a Miller Lite Club to the stadium and additional slab openings.

CCL designed, supplied, and installed the Carbon Fibre Reinforcement (CFRP) system onto the existing concrete beams, columns, and slabs. Our USA team designed the CFRP solution to meet the specified strengthening forces. The team then supplied and installed the system which required the application of several layers of CFRP to the existing structure.