Projects undertaken include:
Sky Tower, Limassol
Designed around the idea of space, Sky Tower emerges from landscaped gardens to minimise the building’s footprint and maximise the use and the beauty of the surrounding area. CCL’s post-tensioned solution helped achieve this architectural vision by enabling tall floor-to-ceiling heights of over three metres and full height glazing to maximise natural light. Optimisation of slab depth also led to cost savings by accelerating the construction schedule and reducing the quantities of concrete and reinforcement required.
Eden Roc Residences, Phases A and B, Limassol
Phase A comprises three adjacent residential blocks of five to seven storeys featuring penthouses with large terraces and pools. Phase B is a single residential block with eight swimming pools at roof level. CCL converted the original reinforced concrete design to post-tensioning to deliver a faster construction program and ensure optimum slab thickness at every level. Increased loads were accommodated without the need for drop beams and deflection was controlled at the slab edge.
Ritz Carlton Residences, Limassol
A 34-storey residential tower forms the centrepiece of this resort. CCL designed 32,000 m² of post-tensioned slabs for the tower itself and 21-metre-long post-tensioned beams for the podium area around the tower’s perimeter to support an elevated external landscaped area. CCL also supplied the post-tensioning systems used in the project and carried out installation training and supervision.
CCL Cyprus
Saleem Kalil
Lapetou 14
Agios Athanasios Industrial Area
Limassol Cy-4101
Cyprus
T: +357 2558 1028
E: cclcyprus@cclint.com
Saleem Kalil
Privacy Policy
© 2023 CCL. All Rights Reserved.
Website managed by Brand North