UAE

Projects undertaken include:

Marina 101, Dubai
Located in the prestigious Dubai Marina, this iconic structure, Marina 101 is the second tallest building in the country comprising 101 floors and rising 412 m high. CCL designed and installed 136,000 m2 of post-tensioned slabs through its own design company CCL Engineering and all components were supplied and controlled by the CCL manufacturing division in the UK.

Ocean Heights, Dubai
Ocean Heights is one of Dubai’s tallest residential buildings standing at 310 meters.  The tower curves and has a twisting motion as one ascends.  Its unique twisting structure means that the layout for each floor is different.  CCL designed and supplied post-tensioned slabs on this 84 storey tower.

Dubai Mall, Dubai
With a total area of 1.2 million m2, almost 50 football (soccer) pitches, and containing more than 1200 shops, 120 restaurants, an indoor Gold Souk, an aquarium and an ice rink, Dubai Mall is the world’s largest shopping mall.  CCL designed and installed 600,000 m2 of post-tensioned slabs.

Company Name

CCL Gulf Prestressed Concrete LLC

Primary Contact

Roland Asaker

Address

Detroit House Building, Flat No 201
Motorcity
Dubai
United Arab Emirates

T: +971 (4) 454 23 42
E: cclgulf@cclint.com

Roland Asaker

Privacy Policy
© 2023 CCL. All Rights Reserved.
Website managed by Brand North