Projects undertaken include:
Reston Office, Washington DC
The 1900 Reston Office building is part of the Reston Metro Plaza development. CCL has supplied the post-tensioning for this iconic tower, the floors of which increase in size as the building ascends.
State University of New York (SUNY), Plattsburgh
Corrosion was discovered in a pedestrian bridge and a podium slab at the State University of New York. CCL undertook meticulous preparation in two phases before installing the cathodic protection system. The company carried out rigorous testing to ensure correct functionality before encapsulation of the system which involved filling the holes with special grout and placing a titanium mesh over the system before casting a concrete topping slab.
Gaylord National Resort and Convention Center, Washington DC
The Gaylord National Hotel and Convention Center is a 2.5 million square feet project which had a total cost of 700 million dollars. CCL USA supplied 1,100 tons of both multistrand bonded and monostrand unbonded systems.
CCL USA Inc.
Marc Khoury
8296 Sherwick Court
Jessup, MD 20794
United States
T: +1 (301) 490 8427
E: cclus@cclint.com
Marc Khoury
Privacy Policy | HSQE Policy
© 2023 CCL. All Rights Reserved.
Website managed by Brand North