• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
    • Policies
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Videos
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Dolmsundbrua, Trondheim, Norway

CCL has supplied and installed its XM post-tensioning system for this impressive cantilever structure on the west coast of Norway.

Dolmsundbrua connects the remote island of Dolmøya to the large Hitra island, crossing the Dolmsundet marine channel at a height of 32 metres above water level.

The bridge spans 490 metres and features two 50 mph motor lanes as well as a pedestrian pathway.

CCL Scandinavia was approached by the main contractor, NCC Construction Norway AB to supply the post-tensioning materials and carry out the installation of CCL XM-50 and XM-60 tendons in lengths of 12-192 metres. In total the company installed 305 tonnes of 15.7 mm strand.

The 12-metre-wide structure significantly reduces travel time between Dolmøya and Hitra by removing the necessity of a ferry crossing.

 

  • Download Case Study
  • Go Back
  • Dolmsundbrua_Norway

    CONTACT US

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    Get In Touch


    Website design and build by Grey Matter | web design sheffield