• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

A new elevated bridge for the Cityringen extension

Skandinavisk Spændbeton has carried out the post-tensioning of a bridge on Copenhagen’s new ‘Cityringen’, a 15.5 km circle line extension to the city’s existing metro.

The new extension will connect the two stations Nordhavn and Orientkaj and provide a direct route linking the new North Harbour mega development.

The bridge, which is located in the town of Nordhavn, consists of four separate sections, each 60 metres long. Skandinavisk Spændbeton was commissioned to supply and install the post-tensioning using CCL’s XM system.

The post-tensioning was carried out in three stages per section. The project started in January and finished in August 2017.

Comments

Comments are currently disabled for this post.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield