• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Post-tensioned slabs installed on Sky Fort in Bulgaria

CCL Post-tensioned Slabs are currently being installed on Sky Fort, a prestigious office tower currently under construction in Sofia, Bulgaria.

CCL is working in partnership with structural engineering company Strukto Ltd, supplying its XF flat slab bonded system and equipment for the entire structure. To provide additional corrosion protection in the three basement levels, CCL’s encapsulated XF system is being installed. Construction of the building began in autumn 2016 with the first CCL tendons installed early 2017.

Seven basement post-tensioned slabs have been poured to date, covering an area of 9,000 sq. m.

Sky Fort is to become the tallest skyscraper in the country at over 200 metres high and will consist of 49 upper storeys with three underground levels of parking.

Designed by A&A Architects, the building will provide comfortable office space with incredible views towards Sofia, Vitosha Mountain and the Sofia Valley. It is expected to be completed in 2020.

Comments

Comments are currently disabled for this post.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield