• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Post-tensioned solution for animal access bridge in Sweden

PEAB Sweden, one of the Nordic region’s leading construction and civil engineering companies, commissioned CCL to supply and install CCL XM post-tensioning systems for the new Sandsjöbacka Bridge which is located over the E6 motorway near Kungsbacka, Sweden.

The bridge is designed to create a seamless extension of existing woodland and grassland areas primarily to enable animals to cross the motorway safely, although there will also be access for pedestrians.

CCL completed the post-tensioning work on the 64-m-long bridge in two stages. Each section comprises a total of 28 cables. Stage one was installed, stressed and prepared to receive the cables from stage two. The stage two cables were successfully coupled to those in stage one and then stressed. An additional 28 cables span the entire length of the bridge.

Comments

Comments are currently disabled for this post.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield