• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Progress at the Clatterbridge Cancer Centre

CCL has begun work on the new Clatterbridge Cancer Centre, a specialist oncology hospital in the centre of Liverpool which is part of a £162 million investment to improve cancer care across Merseyside and Cheshire.

The Cancer Centre is being built next to the new Royal Liverpool University Hospital and the University of Liverpool. The structure will comprise 11 floors and include 110 single en-suite inpatient rooms.

CCL has designed the post-tensioned slabs for above ground levels 0-8 and has now commenced installation of its XF flat slab system.

Due to open in 2020, the new Cancer Centre will provide specialist chemotherapy and other drug therapies, radiotherapy, inpatient and outpatient care, cancer support and rehabilitation, bone marrow transplant and urgent cancer care.

Comments

Comments are currently disabled for this post.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield