• Home
  • About CCL
    • Vision and Mission
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us
Reston Station Office Building 1

PT high rise wins 1st place at ACI awards

Reston Station Office Building 1 (OB1) was awarded 1st place in the high-rise building category at the American Concrete Institute’s (ACI) 2018 Excellence in Concrete Construction awards. CCL supplied the post-tensioning systems for the tower’s two-way, post-tensioned 254 mm-thick concrete slabs in this 16-storey structure.

The building’s design uses exposed concrete to reveal the OB1’s structural system and for architectural purposes. Exposed concrete columns splay outwards to support the post-tensioned slabs which increase in size at each level creating a unique and inspiring shape. CCL is proud to be associated with this iconic structure.

Take a look at the project here.

Comments

Comments are currently disabled for this post.

CONTACT US

Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield