• Home
  • About CCL
    • Vision and Mission
    • Corporate Governance
    • Locations
    • Approvals/Compliance
    • Memberships and Affiliations
    • Policies
  • Expertise
    • Slab Solutions
    • Post-Tensioning
    • Precast
    • Repair and Strengthening
    • Structural Bearings
    • Geotechnical
  • Structures
    • Buildings
    • Bridges
    • Containment
    • Turbines
    • Stadia
    • Pavement SOG
  • Sectors
    • Commercial
    • Residential
    • Health
    • Education
    • Industrial
    • Retail
    • Leisure
    • Transport And Infrastructure
    • Environmental
    • Power And Utilities
  • Downloads
    • Brochures
    • Articles
    • Videos
    • Case Studies
  • News
  • Human Resources
    • CCL People
    • Careers
    • How To Join Us
  • Contact Us

Saudi Arabia

Company Name
CCL KSA

Primary Contact
Hani Fallah

Address

Madinah Road
Adham Center
P.O. Box 13533
Jeddah 21414
Saudi Arabia

T: +966 (12) 6144 784
E:  cclksa@cclint.com
F: +966 (12) 6144 785

CCL KSA_Saudi Arabia_Contact_Hani Fallah_General Manager

Hani Fallah

Projects undertaken include:

Golden Tower, Jeddah

Golden Tower is a residential development located on the Jeddah Corniche. The structure stands 205 metres high offering far-reaching views across the Red Sea. CCL devised a solution to value engineer 30 floors of the structure which resulted in the conversion of multi-level soffits to simple post-tensioned flat slabs.

Jamarat Bridge, Mina

Located in Mina, the colossal Jamerat Bridge was constructed to improve the safety of Hajj pilgrims. The pilgrams can now stone all three jamarahs from any of the bridge's four storeys. The column-free spaces have spans of 60 m to 100 m. CCL supplied 40,000 post-tensioning anchorage units, 60 sets of stressing equipment and provided full technical support throughout the post-tensioning operations.

Al Nakheel Tower, Riyadh

One of the most prestigious projects in the Kingdom of Saudi Arabia, the Al Nakheel tower is a luxury hotel with VIP penthouses. CCL’s alternative design allowed the removal of some internal columns to create the larger spans specified by the client.

CONTACT US

CCL
Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0)113 270 1221
E: enquiries@cclint.com

Get In Touch


Website design and build by Grey Matter | web design sheffield