September 11, 2021
The first SigmaSlab®-G has been installed by Delporte at Aertssen Group’s site in Verrebroek, Belgium.
Aertssen is a construction and infrastructure company based in Antwerp, Belgium. The company is constructing some new logistics buildings and warehouses to store machinery and parts, one of which required an outdoor concrete ground slab for the loading dock.
CCL and Bekaert designed a 190 mm thick SigmaSlab®-G over an area of 110-metre by 24-metre for the loading dock where delivery trucks will dock at the dock levelers.
Read more about the project here and watch the project video.
Privacy Policy | HSQE Policy
© 2023 CCL. All Rights Reserved.
Website managed by Brand North